Set up the In Parallel + Excel project workflow in Claude - In Parallel help

Set up the In Parallel + Excel project workflow in Claude

Connect In Parallel to Claude over MCP and Claude can read what has actually happened in your execution layer — decisions, drift, goals, action items — and fold it into the…

Updated 29 June 2026

Connect In Parallel to Claude over MCP and Claude can read what has actually happened in your execution layer — decisions, drift, goals, action items — and fold it into the Excel project plan you already maintain. The result: a plan that refreshes statuses, due dates, goals, and risks against reality, logs every change, and keeps your original baseline intact.

This works with the boundary between the two tools, not against it. In Parallel holds the execution layer — the source of truth for what changed and why. Excel holds the plan artifact — the format your stakeholders read. Claude reconciles reality into the artifact so neither has to become the other. (New to that split? See Integrations.)

This guide gets the pairing ready. Once it’s set up, Use the In Parallel MCP with Excel in Claude runs it.

What you’ll set up

  • A Claude Project dedicated to the pairing, so every run starts from the same ground rules.
  • The In Parallel MCP connector enabled inside it.
  • Project instructions that tell Claude how the two tools relate.
  • Your Excel plan in the project folder, for Claude to reconcile against.

Before you start

  • In Parallel connected to Claude over MCP. Set this up first — see Connect your AI tool to In Parallel.
  • An Excel plan you already maintain (.xlsx) — for example sheets for the project plan, goals, and risks. A baseline snapshot is exactly right; it’s what Claude reconciles the current reality against.
  • Your In Parallel Workspace name(s) — the program and any sub-projects it contains.

These steps use Claude Desktop, because Claude works directly with the .xlsx file in a local folder, and the optional scheduled refresh (covered in the companion guide) relies on Claude Desktop’s scheduled tasks. The connector is named In Parallel MCP in these screenshots — what matters is that it points at In Parallel’s MCP endpoint.

A note on privacy. Reconciling sends your In Parallel execution data to Claude. Before you start, decide whether to mask people — see MCP privacy: mask people in AI responses — and skim What the AI can and can’t see so you know what reaches the assistant.

1. Create a Claude Project for the pairing

In Claude, create a Project (for example “In Parallel – Excel”). A Project keeps the instructions, the connector, and the file together, so every reconcile starts from the same context and your prompts can stay short.

A Claude Project named In Parallel – Excel: the chat composer on the left with the reconcile prompt, and the Instructions, Scheduled, and Context panels on the right

2. Enable the In Parallel connector

Turn on the In Parallel MCP connector for the Project so Claude can read your execution data. Once enabled, it appears under Context → Connectors in every chat in the Project.

The Context panel showing In Parallel MCP listed under Connectors

Keep the connector’s tools on Needs approval to start — Claude asks before each In Parallel read, so you stay in control of what it pulls. The reads are described in the In Parallel MCP tools reference.

3. Write the Project instructions

Add a short instructions block (the panel on the right of the Project) that states how the two tools relate and your house rules. The instructions in the screenshot above read:

“This project folder is used for connecting Excel-based project management and the execution context and reality managed by In Parallel. Claude is used to read and update both. In Parallel is accessed by the MCP connector and Excel is read and updated with Claude’s Excel functionality.”

Then add the house rules you want every run to follow, for example:

  • Which In Parallel Workspace maps to the file — name the program and any sub-projects.
  • How to represent changes — e.g. highlight changed cells and always add a Changelog sheet.
  • Keep the baseline intact — always save the result as a new, dated file rather than overwriting the original.

With that context attached, you can keep each reconcile prompt to a sentence or two.

4. Add your Excel plan to the project

Put your .xlsx in the Project folder (or attach it to the chat). Claude reads its sheet structure first — so its updates preserve your existing format rather than reformatting the file.

The baseline Excel workbook: a Project Plan sheet with tasks, statuses, and a status summary, plus Goals and Risks tabs

The cleaner the baseline, the cleaner the reconcile: clear column headers, one row per task, and an explicit status column give Claude unambiguous cells to update.

You’re set up

The pairing is ready. To run your first reconcile — revise statuses and dates, add new workstreams, refresh goals and risks, and log every change — see Use the In Parallel MCP with Excel in Claude.