For ERP implementation teams

Go-live is in 6 months. Which workstream decisions are already drifting?

In Parallel captures every workstream decision — owner, deadline, context — and turns them into a living implementation plan that detects drift before it delays go-live. Start free.

ERP implementation programme manager reviewing cross-workstream decision dashboard

The coordination tax

8 workstreams. 40 workshops a week. Where did that configuration decision go?

ERP implementations generate thousands of decisions across finance, IT, HR, and operations. When workstream meetings don’t propagate, go-live slips.

75%

of ERP implementations exceed their original timeline.

Cross-functional coordination failures are the primary driver — not technical complexity, not vendor capability, but decisions that don’t propagate between workstreams.

Panorama Consulting ERP Report

Thousands of decisions

A typical SAP/Oracle implementation generates thousands of configuration decisions across workshops. They live in spreadsheets, slide decks, and people’s memories.

Workshop amnesia

A configuration decision made in a finance workshop contradicts an integration assumption from IT. Nobody catches it until UAT fails three months later.

6 tools, zero traceability

Jira for IT, SharePoint for docs, Teams for meetings, Excel for RAID logs. None of them show the PMO what was decided across all workstreams this week.

How In Parallel helps

From 40 workshops to one shared reality.

01

Cross-workstream decision capture

In Parallel joins your finance, IT, HR, and operations workstream meetings — captures every configuration decision, owner, and deadline. No manual minutes. No chasing programme leads.

02

Living implementation plan

Your plan updates itself from meeting signals. When a finance workstream decision affects the HR cutover timeline, it surfaces immediately — not three weeks later in the steering committee.

03

Go-live readiness drift detection

Know when a workstream diverges from what was agreed before it delays go-live. In Parallel surfaces the gap between workshop decisions and actual progress automatically.

04

Steering committee reporting

Stop spending days assembling status packs from 8 different workstream leads. Execution health data is always current because it comes from the meetings where decisions actually happen.

Trusted by programme teams

An SAP S/4HANA programme cut steering committee prep from 2 days to 30 minutes.

“We stopped losing decisions between workstreams. When finance changed the chart of accounts structure, the downstream impact on reporting was visible within hours — not discovered during integration testing.”
— Programme Director, global SAP S/4HANA implementation

75%

faster steering committee prep

100%

of workshop decisions tracked

3 wks

earlier drift detection

<1 wk

typical time to value

Side by side

What changes when workstream decisions stop disappearing.

Without In Parallel

  • Configuration decisions buried in workshop notes nobody reads
  • Workstream leads contradicting each other in steering meetings
  • Go-live risks discovered 2 weeks before cutover
  • Status packs stale before the steering committee sees them
  • Integration dependencies missed until testing fails

With In Parallel

  • Every workshop decision captured with owner, deadline, and context
  • Cross-workstream dependencies visible in real time
  • Drift detected before it affects the go-live date
  • Steering committee data always current — 30-minute prep
  • Integration decisions tracked from the meeting they were made in

Built for ERP programmes

Your tools. Your meetings. Zero behaviour change.

In Parallel layers onto what your programme team and SI already use. Nobody downloads an app. Nobody changes their workflow. It just works.

Works with your stack

Microsoft Teams, Zoom, Slack, SharePoint, Jira. In Parallel layers onto what your SI and internal teams already use — no migration.

SOC 2 compliant

Enterprise security your programme sponsor expects. EU data residency available. Audit reports on request.

Per-seat pricing

€69 per active seat per month, with annual and volume discounts down to €49. Workspaces are free. Passive users aren’t invoiced. 10 meetings free to try, no credit card.

Zero behaviour change

In Parallel joins your existing meetings. Nobody downloads an app. Nobody changes their workflow. Your SI consultants won't even notice.

Cross-functional by design

Not a finance tool. Not an IT tool. A coordination layer that works across every workstream in your ERP programme.

Start free in 5 minutes

Add the AI notetaker to your next workstream meeting. No procurement, no IT review, no risk. See results immediately.

Start in 5 minutes

Add it to your next workstream meeting. See every decision captured.

10 meetings free, no credit card. Try it on your next workshop or workstream sync. See every configuration decision with an owner and a deadline. Then decide if you want the Living Plan.