For defence programme managers

Prime contractor. Sub-tier suppliers. Milestone coordination that can’t slip.

In Parallel captures every programme decision — owner, deadline, context — across prime and sub-tier teams and turns them into a living milestone plan that updates itself. Start free.

Defence programme manager reviewing milestone coordination dashboard across prime and sub-tier suppliers

The coordination tax

15 contractors. 200 milestones. How many commitments can you track?

Defence programmes coordinate across primes, sub-tier suppliers, and programme offices. Decisions scatter across IPTs, contractor reviews, and email chains.

70%

of defence programme delays originate in sub-tier supplier coordination failures.

The programme has outgrown spreadsheets and status slides but hasn’t built the operational infrastructure to replace them.

GAO Defence Acquisition Assessment 2024

3 days per month

The average programme manager spends assembling status reports from contractor updates, IPT minutes, and milestone trackers that are already out of date.

Invisible commitment drift

A sub-tier supplier quietly re-sequences a deliverable. The prime doesn’t know until the milestone review. Nobody flagged it because nobody saw it.

8 systems, zero visibility

P6 for scheduling, Jira for engineering, SharePoint for documents, email for decisions. None of them show the programme manager what was decided across all contractors this week.

How In Parallel helps

From 15 contractor updates to one shared reality.

01

Programme meeting decision capture

In Parallel joins your IPTs, programme reviews, and contractor stand-ups — captures every decision, action owner, and deadline across prime and sub-tier teams. No manual minutes. No chasing.

02

Living milestone tracker

Your programme plan updates itself from meeting signals. When a sub-tier supplier flags a delay in their weekly, it surfaces in the master schedule immediately — not three weeks later at a programme review.

03

Contractor commitment drift detection

Know when a supplier diverges from what was agreed before it threatens a milestone. In Parallel surfaces the gap between committed deliverables and actual progress automatically.

04

Programme office reporting

Stop spending days assembling programme status from 12 different contractors. Execution health data is always current because it comes from the meetings where decisions actually happen.

Trusted by programme teams

A Tier 1 defence programme cut status reporting from 3 days to 30 minutes.

“We went from chasing 12 sub-tier suppliers for status updates to having a living programme view. Not because we meet more — because every decision is already captured.”
— Programme Manager, Tier 1 Defence Contractor

90%

less time on status assembly

3 days

saved per reporting cycle

2 weeks

earlier milestone risk detection

<4 wks

typical time to value

Side by side

What changes when programme decisions stop disappearing.

Without In Parallel

  • Monday mornings reconstructing last week’s IPT decisions
  • Programme reviews based on stale contractor status reports
  • Milestone slips discovered after they cascade
  • Status decks assembled from a dozen sub-tier updates
  • Commitment drift invisible until the next gate review

With In Parallel

  • Every decision captured with owner, deadline, and context
  • Programme status always current — built from live meeting data
  • Milestone risk flagged before it cascades to dependent workstreams
  • Programme office reports assembled in 30 minutes, not 3 days
  • Drift detected before it threatens a contract milestone

Built for defence programmes

Your tools. Your meetings. Zero behaviour change.

In Parallel layers onto what you already use. Nobody downloads an app. Nobody changes their workflow. It just works.

Works with your stack

Teams, Zoom, Google Meet, SharePoint, Jira, P6. In Parallel layers onto what you already use — no migration.

SOC 2 + ITAR-aware

Enterprise security that defence programmes demand. Data residency controls. Audit reports on request.

Per-seat pricing

€69 per active seat per month, with annual and volume discounts down to €49. Workspaces are free. Passive users aren’t invoiced. 10 meetings free to try, no credit card.

Zero behaviour change

In Parallel joins your existing meetings. Nobody downloads an app. Nobody changes their workflow. It just works.

Multi-tier by design

Not an engineering tool. Not a procurement tool. A coordination layer that works across prime, sub-tier, and programme office.

Start free in 5 minutes

Add the AI notetaker to your next programme meeting. No procurement cycle, no IT review, no risk. See results immediately.

Start in 5 minutes

Add it to your next programme meeting. See every decision captured.

10 meetings free, no credit card. Try it on your next IPT or contractor review. See every decision with an owner and a deadline. Then decide if you want the Living Plan.